The project demanded a substantial effort in terms of engineering and manufacture in order to satisfy two major conflicting requirements: a tight execution schedule typical of large industrial projects and modifications affecting some 700 tons in mid-stream. The latter was caused by changing design criteria: the modifications have been accomodated with minimum rework and disruption to the project schedule. Two interesting features of this large project are in the extensive use of epoxy coated steel sheeting (the proprietary and well known VERSACOR® product), and in the highly developed anti-corrosion paint of the structural members, provided by SIGMA PAINTS.

POWER PLANT IN U.A.E.

End-user : U.A.E. Institution
Consultant : FITCHNER CONSULTING ENGINEERS
Contractor : HYUNDAI ENGINEERING
Erector : FUJAIRAH NATIONAL CONSTRUCTION
Construction Period : 2000
Tonnage : 1,200 MT
Area (m2) : 4,754
Cladding/Roofing/(m2) : 16,000