|
 |
|
This spectacular structure is made of UB 914 X 305 X 289 profiles, spanning 82.4 metres. The height at the apex of the frame is 38.3 metres above ground. The detailed design, the manufacture and the erection have been done by EBS over a 3-month period. The heavy beams of the frame have been installed in five sections, resting on scaffoldings specially erected for the purpose by Messrs. SGB-Al Qubeisi.
|
| RAW SUGAR STORAGE IN DUBAI (U.A.E.)
| End-user |
: KHALEEJ SUGAR |
| Consultant |
: HYDER CONSULTING |
| Erector |
: EMIRATES BUILDING SYSTEMS CO. LLC |
| Construction Period |
: 2001 |
| Tonnage |
: 500 MT |
| Area (m2) |
: 3,197 |
|
|
About EBS | Products | Services | Projects | Highlights
|