The project is interesting in several ways, the most remarkable one being the fast track execution. From start of design to completion of erection, the building took four months. The building features a large atrium covered by an asthetic tent structure which highlights the flexibility of steel structures to architectural demands.
|
| BAHRAIN MALL AT AL SANABIS
| Consultant |
: ARIF SADIQ DESIGN CONSULTANTS |
| Contractor |
: KEY CONSTRUCTORS |
| Erector |
: FUJAIRAH NATIONAL CONSTRUCTION |
| Construction Period |
: 2000 |
| Tonnage |
: 3,000 MT |
| Area (m2) |
: 39,865 |
| Cladding/Roofing (m2) |
: 42,000 |
| Steel Decking (m2) |
: 40,000 |
|
|